Menú
Inicio
Visitar el Sitio Zona Militar
Foros
Nuevos mensajes
Buscar en los foros
Qué hay de nuevo
Nuevos mensajes
Última actividad
Miembros
Visitantes actuales
Entrar
Registrarse
Novedades
Buscar
Buscar
Buscar sólo en títulos
Por:
Nuevos mensajes
Buscar en los foros
Menú
Entrar
Registrarse
Inicio
Foros
Fuerzas Navales
Noticias y Actualidad de las Fuerzas Navales
Búsqueda de ARA San Juan - discusiones paralelas
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
Estás usando un navegador obsoleto. No se pueden mostrar estos u otros sitios web correctamente.
Se debe actualizar o usar un
navegador alternativo
.
Responder al tema
Mensaje
<blockquote data-quote="koinorr" data-source="post: 2332380" data-attributes="member: 2417"><p>Tengo mis reservas al respecto. Encontré ésto del congreso de USA.</p><p><a href="http://www.gao.gov/assets/590/589695.pdf">http://www.gao.gov/assets/590/589695.pdf</a></p><p><a href="http://www.gao.gov/assets/590/589695.pdf">P-8A Program Technology Maturity The P-8A entered production in August 2010 with mature technologies. The current critical technology, the hydrocarbon sensor, has been tested in ground-based applications and program officials indicated that flight testing will occur in fiscal year 2012. The program also noted that it has begun flight testing the ESM digital receiver and the sonobuoy launcher, two technologies that were previously identified as being critical but are no longer designated as such based on their use in other platforms. The P-8A program has been authorized to incorporate a set of capabilities initially planned as a separate increment into the baseline program primarily because these improvements will entail the integration of mature technologies into the aircraft.</a></p></blockquote><p></p>
[QUOTE="koinorr, post: 2332380, member: 2417"] Tengo mis reservas al respecto. Encontré ésto del congreso de USA. [URL]http://www.gao.gov/assets/590/589695.pdf[/URL] [URL='http://www.gao.gov/assets/590/589695.pdf']P-8A Program Technology Maturity The P-8A entered production in August 2010 with mature technologies. The current critical technology, the hydrocarbon sensor, has been tested in ground-based applications and program officials indicated that flight testing will occur in fiscal year 2012. The program also noted that it has begun flight testing the ESM digital receiver and the sonobuoy launcher, two technologies that were previously identified as being critical but are no longer designated as such based on their use in other platforms. The P-8A program has been authorized to incorporate a set of capabilities initially planned as a separate increment into the baseline program primarily because these improvements will entail the integration of mature technologies into the aircraft.[/URL] [/QUOTE]
Insertar citas…
Verificación
¿Cuanto es 2 mas 6? (en letras)
Responder
Inicio
Foros
Fuerzas Navales
Noticias y Actualidad de las Fuerzas Navales
Búsqueda de ARA San Juan - discusiones paralelas
Este sitio usa cookies. Para continuar usando este sitio, se debe aceptar nuestro uso de cookies.
Aceptar
Más información.…
Arriba