Menú
Inicio
Visitar el Sitio Zona Militar
Foros
Nuevos mensajes
Buscar en los foros
Qué hay de nuevo
Nuevos mensajes
Última actividad
Miembros
Visitantes actuales
Entrar
Registrarse
Novedades
Buscar
Buscar
Buscar sólo en títulos
Por:
Nuevos mensajes
Buscar en los foros
Menú
Entrar
Registrarse
Inicio
Foros
Fuerzas Navales
Noticias y Actualidad de las Fuerzas Navales
Noticias de la Armada de Chile
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
Estás usando un navegador obsoleto. No se pueden mostrar estos u otros sitios web correctamente.
Se debe actualizar o usar un
navegador alternativo
.
Responder al tema
Mensaje
<blockquote data-quote="HernanSCL" data-source="post: 3620119" data-attributes="member: 31027"><p>Bonito bicho</p><p></p><p><img src="https://www.seaforces.org/marint/Canadian-Navy/AVIATION/Aurora_DAT/CP-140-Aurora-014.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><h3>CP-140 Aurora fleet modernization and life extension</h3><h3>Project summary</h3><p>The Government of Canada is modernizing its fleet of 14 Aurora aircraft. The Aurora Incremental Modernization Project (AIMP) involves 23 individual projects to acquire, integrate and install new mission systems and sensors onto the CP-140 for intelligence, surveillance and reconnaissance. This project is being executed in a phased approach with four blocks; blocks I, II and III are complete, and block IV is in the implementation phase.</p><p>The Government of Canada has also extended the life of the Aurora fleet. The Aurora Structural Life Extension Project (ASLEP) involved replacing wings and horizontal stabilizers on the aircraft, which will extend the operational life of the CP-140 Aurora fleet to the 2030 timeframe. All aircraft have been life-extended and the project is currently in the close-out phase.</p><p>The Aurora fleet is Canada’s primary airborne intelligence, surveillance, and reconnaissance aircraft. The Aurora provides a full range of maritime, littoral and overland surveillance capabilities for domestic and deployed missions in support of Canadian sovereignty and international objectives, as well as anti-surface and anti-submarine warfare. It has been modernized with a world-class integrated mission suite with state-of-the-art avionics, communications systems, computer networks, and sensors.</p><h4>Related Links</h4><p><a href="https://www.rcaf-arc.forces.gc.ca/en/aircraft-current/cp-140.page">CP-140 Aurora equipment page</a><a href="http://www.tpsgc-pwgsc.gc.ca/app-acq/amd-dp/samd-dps/index-eng.html">Defence Procurement Strategy</a><a href="http://www.ic.gc.ca/eic/site/042.nsf/eng/aa00015.html">CP 140 Aurora System Support, Avionics</a><a href="http://www.ic.gc.ca/eic/site/042.nsf/eng/aa00014.html">CP-140 Aurora System Support, Airframe Maintenance</a><a href="http://www.ic.gc.ca/eic/site/042.nsf/eng/aa00012.html">CP-140 Aurora Imaging Radar System</a><a href="http://www.ic.gc.ca/eic/site/042.nsf/eng/aa00010.html">CP-140 Aurora Data Management System</a><a href="http://www.ic.gc.ca/eic/site/042.nsf/eng/aa00008.html">CP 140 Aurora Structural Life Extension Project</a></p><h3>Project phases</h3><p><img src="https://www.canada.ca/content/dam/dnd-mdn/images/procurement/timeline/procurement-timeline-phase-4.jpg" alt="Phase 4" class="fr-fic fr-dii fr-draggable " style="" /></p><p><strong>Currently in Phase 4: Implementation</strong></p><ul> <li data-xf-list-type="ul"><a href="https://www.canada.ca/en/department-national-defence/services/procurement/cp-140-aurora.html#details-panel-1470993891214-1">1. Identification</a></li> <li data-xf-list-type="ul"><a href="https://www.canada.ca/en/department-national-defence/services/procurement/cp-140-aurora.html#details-panel-1470993891214-2">2. Options analysis</a></li> <li data-xf-list-type="ul"><a href="https://www.canada.ca/en/department-national-defence/services/procurement/cp-140-aurora.html#details-panel-1470993891214-3">3. Definition</a></li> <li data-xf-list-type="ul"><a href="https://www.canada.ca/en/department-national-defence/services/procurement/cp-140-aurora.html#details-panel-1470993891214-4">4. Implementation</a></li> <li data-xf-list-type="ul"><a href="https://www.canada.ca/en/department-national-defence/services/procurement/cp-140-aurora.html#details-panel-1470993891214-5">5. Close-out</a></li> </ul><h4>4. Implementation</h4><h4>Aurora incremental modernization project (AIMP)</h4> <ul> <li data-xf-list-type="ul">Block I: Replace the high frequency radio and a number of obsolete systems in order to provide a baseline for the major upgrades that followed<ul> <li data-xf-list-type="ul">Project approval: October 1999</li> <li data-xf-list-type="ul">Contract award: December 1999</li> <li data-xf-list-type="ul">Initial operational capability: 1 December 2003</li> <li data-xf-list-type="ul">Full operational capability: December 2005</li> </ul></li> <li data-xf-list-type="ul">Block II: Replace the outdated navigation and communication management systems, and associated radios<ul> <li data-xf-list-type="ul">Project approval<ul> <li data-xf-list-type="ul">Navigation systems: June 1999</li> <li data-xf-list-type="ul">Communications systems: June 2002</li> </ul></li> <li data-xf-list-type="ul">Contract award:<ul> <li data-xf-list-type="ul">Navigation systems: August 2000</li> <li data-xf-list-type="ul">Communications systems: June 2002</li> </ul></li> <li data-xf-list-type="ul">Initial operational capability: February 2008</li> <li data-xf-list-type="ul">Full operational capability: March 2012</li> </ul></li> <li data-xf-list-type="ul">Block III: Replace the mission computer and sensors (radar, electro-optics/infrared sensor package, ESM, and acoustic detection systems)<ul> <li data-xf-list-type="ul">Project approval: May 2002</li> <li data-xf-list-type="ul">Contract award: May 2002</li> <li data-xf-list-type="ul">Initial operational capability: January 31, 2014</li> <li data-xf-list-type="ul">Full operational capability: December 18, 2019</li> </ul></li> <li data-xf-list-type="ul">Block IV: Upgrade three key features of the fourteen block III configured aircraft: beyond-line-of-sight satellite communication, link 16 datalink (a military tactical data exchange network used by NATO countries), and self defence system.<ul> <li data-xf-list-type="ul">Project approval:<ul> <li data-xf-list-type="ul">Definition: October 24, 2013</li> <li data-xf-list-type="ul">Implementation: June 16, 2015</li> </ul></li> <li data-xf-list-type="ul">Contract award: October 16, 2015</li> <li data-xf-list-type="ul">Initial operational capability: winter 2024</li> <li data-xf-list-type="ul"><strong>Full operational capability: summer 2024</strong></li> </ul></li> </ul><h4>Aurora structural life extension project (ASLEP)</h4> <ul> <li data-xf-list-type="ul">Project approval: May 2008</li> <li data-xf-list-type="ul">Initial operational capability: April 11, 2012</li> <li data-xf-list-type="ul">Full operational capability: April 24, 2020</li> </ul><p>Learn more about the <a href="https://www.canada.ca/en/department-national-defence/services/procurement/defence-purchases-upgrades-process.html">Defence procurement process</a>.</p><h3>Additional information</h3> <ul> <li data-xf-list-type="ul"><a href="https://www.canada.ca/en/department-national-defence/services/procurement/cp-140-aurora.html#details-panel-1470993891209-1">Project Updates</a></li> <li data-xf-list-type="ul"><a href="https://www.canada.ca/en/department-national-defence/services/procurement/cp-140-aurora.html#details-panel-1470993891209-2">Industry</a></li> <li data-xf-list-type="ul"><a href="https://www.canada.ca/en/department-national-defence/services/procurement/cp-140-aurora.html#details-panel-1470993891209-3">Technical information</a></li> <li data-xf-list-type="ul"><a href="https://www.canada.ca/en/department-national-defence/services/procurement/cp-140-aurora.html#details-panel-1470993891209-4">Project cost</a></li> <li data-xf-list-type="ul"><a href="https://www.canada.ca/en/department-national-defence/services/procurement/cp-140-aurora.html#details-panel-1470993891209-5">Issues/Risks</a></li> </ul><h4>Project Updates</h4><p><strong>December 3, 2021</strong></p><p>Proof of compliance phase 2 and operational test and evaluation phase 1 completed.</p><p><strong>July 25, 2021</strong></p><p>Combined proof of compliance phase 2 (Mission Systems) and operational flight testing has started.</p><p><strong>April 11, 2021</strong></p><p>First phase of proof of compliance flight testing (Flight Sciences) completed on CP140111.</p><p><strong>March 30, 2021</strong></p><p>CP140118 (Production aircraft #1) delivered to 14 Wing Greenwood.</p><p><strong>December, 2020</strong></p><p>CP140111 14 Wing Greenwood has started.</p><p><strong>October 6, 2020</strong></p><p>Started modification of production to the third aircraft.</p><p><strong>July 21, 2020</strong></p><p>The 2nd block IV prototype aircraft, CP140111, completed its first test flight from the IMP facility located at Halifax International Airport.</p><p><strong>April 24, 2020</strong></p><p>CP140114, the fourteenth and last aircraft to receive the structural modifications under ASLEP was delivered.</p><p><strong>February 21, 2020</strong></p><p>CP140108, completed its initial assessment flight, landing at 14 Wing Greenwood.</p><p><strong>October 4, 2019</strong></p><p>Second incremental ground test readiness review is complete.</p><p><strong>June 26, 2019</strong></p><p>Aircraft CP140110 was delivered. This is the 14th (and last) block III aircraft, of which 13 have been life-extended.</p><p><strong>April 29, 2019</strong></p><p>The block IV prototype aircraft ground test readiness review was conducted.</p><p><strong>October 16, 2015</strong></p><p>General Dynamics won a contract amendment to implement the block IV modifications to the data management system.</p><p><strong>June 2015</strong></p><p>Block IV of the AIMP received project approval.</p><p><strong>October 2014</strong></p><p>Two CP-140 Aurora were deployed on Operation IMPACT, the Canadian Armed Forces’ contribution to the fight against ISIL in the Middle East.</p><p><strong>January 31, 2014</strong></p><p>Initial operational capability for block III was achieved. Block III involves the upgrade of the mission systems and sensors.</p><p><strong>March 2012</strong></p><p>Block II of the AIMP was completed, involving replacement of outdated navigation and communication management systems, and associated radios.</p><p><strong>March 2011</strong></p><p>Two CP-140 Aurora were deployed on Operation MOBILE, the Canadian Armed Forces’ participation in the international response to the popular uprising in Libya against the regime of Moammar Gadhafi.</p><p><strong>February 2010</strong></p><p>One CP-140 Aurora supported the RCMP-led integrated security unit for the 2010 Vancouver Olympic Games under Operation PODIUM.</p><p><strong>December 2005</strong></p><p>Block I of the AIMP was completed, involving replacement of the high frequency radio and several obsolete systems to provide a baseline for other major upgrades that will follow.</p><h3>Page details</h3><p>Date modified: 2023-06-30</p><p></p><p>[URL unfurl="true"]https://www.canada.ca/en/department-national-defence/services/procurement/cp-140-aurora.html[/URL]</p><p></p><p>Están extendidos y upradeados, SATCOM y hasta LINK 16.</p><p></p><p>Saludos</p></blockquote><p></p>
[QUOTE="HernanSCL, post: 3620119, member: 31027"] Bonito bicho [IMG]https://www.seaforces.org/marint/Canadian-Navy/AVIATION/Aurora_DAT/CP-140-Aurora-014.jpg[/IMG] [HEADING=2]CP-140 Aurora fleet modernization and life extension[/HEADING] [HEADING=2]Project summary[/HEADING] The Government of Canada is modernizing its fleet of 14 Aurora aircraft. The Aurora Incremental Modernization Project (AIMP) involves 23 individual projects to acquire, integrate and install new mission systems and sensors onto the CP-140 for intelligence, surveillance and reconnaissance. This project is being executed in a phased approach with four blocks; blocks I, II and III are complete, and block IV is in the implementation phase. The Government of Canada has also extended the life of the Aurora fleet. The Aurora Structural Life Extension Project (ASLEP) involved replacing wings and horizontal stabilizers on the aircraft, which will extend the operational life of the CP-140 Aurora fleet to the 2030 timeframe. All aircraft have been life-extended and the project is currently in the close-out phase. The Aurora fleet is Canada’s primary airborne intelligence, surveillance, and reconnaissance aircraft. The Aurora provides a full range of maritime, littoral and overland surveillance capabilities for domestic and deployed missions in support of Canadian sovereignty and international objectives, as well as anti-surface and anti-submarine warfare. It has been modernized with a world-class integrated mission suite with state-of-the-art avionics, communications systems, computer networks, and sensors. [HEADING=3]Related Links[/HEADING] [URL='https://www.rcaf-arc.forces.gc.ca/en/aircraft-current/cp-140.page']CP-140 Aurora equipment page[/URL][URL='http://www.tpsgc-pwgsc.gc.ca/app-acq/amd-dp/samd-dps/index-eng.html']Defence Procurement Strategy[/URL][URL='http://www.ic.gc.ca/eic/site/042.nsf/eng/aa00015.html']CP 140 Aurora System Support, Avionics[/URL][URL='http://www.ic.gc.ca/eic/site/042.nsf/eng/aa00014.html']CP-140 Aurora System Support, Airframe Maintenance[/URL][URL='http://www.ic.gc.ca/eic/site/042.nsf/eng/aa00012.html']CP-140 Aurora Imaging Radar System[/URL][URL='http://www.ic.gc.ca/eic/site/042.nsf/eng/aa00010.html']CP-140 Aurora Data Management System[/URL][URL='http://www.ic.gc.ca/eic/site/042.nsf/eng/aa00008.html']CP 140 Aurora Structural Life Extension Project[/URL] [HEADING=2]Project phases[/HEADING] [IMG alt="Phase 4"]https://www.canada.ca/content/dam/dnd-mdn/images/procurement/timeline/procurement-timeline-phase-4.jpg[/IMG] [B]Currently in Phase 4: Implementation[/B] [LIST] [*][URL='https://www.canada.ca/en/department-national-defence/services/procurement/cp-140-aurora.html#details-panel-1470993891214-1']1. Identification[/URL] [*][URL='https://www.canada.ca/en/department-national-defence/services/procurement/cp-140-aurora.html#details-panel-1470993891214-2']2. Options analysis[/URL] [*][URL='https://www.canada.ca/en/department-national-defence/services/procurement/cp-140-aurora.html#details-panel-1470993891214-3']3. Definition[/URL] [*][URL='https://www.canada.ca/en/department-national-defence/services/procurement/cp-140-aurora.html#details-panel-1470993891214-4']4. Implementation[/URL] [*][URL='https://www.canada.ca/en/department-national-defence/services/procurement/cp-140-aurora.html#details-panel-1470993891214-5']5. Close-out[/URL] [/LIST] [HEADING=3]4. Implementation[/HEADING] [HEADING=3]Aurora incremental modernization project (AIMP)[/HEADING] [LIST] [*]Block I: Replace the high frequency radio and a number of obsolete systems in order to provide a baseline for the major upgrades that followed [LIST] [*]Project approval: October 1999 [*]Contract award: December 1999 [*]Initial operational capability: 1 December 2003 [*]Full operational capability: December 2005 [/LIST] [*]Block II: Replace the outdated navigation and communication management systems, and associated radios [LIST] [*]Project approval [LIST] [*]Navigation systems: June 1999 [*]Communications systems: June 2002 [/LIST] [*]Contract award: [LIST] [*]Navigation systems: August 2000 [*]Communications systems: June 2002 [/LIST] [*]Initial operational capability: February 2008 [*]Full operational capability: March 2012 [/LIST] [*]Block III: Replace the mission computer and sensors (radar, electro-optics/infrared sensor package, ESM, and acoustic detection systems) [LIST] [*]Project approval: May 2002 [*]Contract award: May 2002 [*]Initial operational capability: January 31, 2014 [*]Full operational capability: December 18, 2019 [/LIST] [*]Block IV: Upgrade three key features of the fourteen block III configured aircraft: beyond-line-of-sight satellite communication, link 16 datalink (a military tactical data exchange network used by NATO countries), and self defence system. [LIST] [*]Project approval: [LIST] [*]Definition: October 24, 2013 [*]Implementation: June 16, 2015 [/LIST] [*]Contract award: October 16, 2015 [*]Initial operational capability: winter 2024 [*][B]Full operational capability: summer 2024[/B] [/LIST] [/LIST] [HEADING=3]Aurora structural life extension project (ASLEP)[/HEADING] [LIST] [*]Project approval: May 2008 [*]Initial operational capability: April 11, 2012 [*]Full operational capability: April 24, 2020 [/LIST] Learn more about the [URL='https://www.canada.ca/en/department-national-defence/services/procurement/defence-purchases-upgrades-process.html']Defence procurement process[/URL]. [HEADING=2]Additional information[/HEADING] [LIST] [*][URL='https://www.canada.ca/en/department-national-defence/services/procurement/cp-140-aurora.html#details-panel-1470993891209-1']Project Updates[/URL] [*][URL='https://www.canada.ca/en/department-national-defence/services/procurement/cp-140-aurora.html#details-panel-1470993891209-2']Industry[/URL] [*][URL='https://www.canada.ca/en/department-national-defence/services/procurement/cp-140-aurora.html#details-panel-1470993891209-3']Technical information[/URL] [*][URL='https://www.canada.ca/en/department-national-defence/services/procurement/cp-140-aurora.html#details-panel-1470993891209-4']Project cost[/URL] [*][URL='https://www.canada.ca/en/department-national-defence/services/procurement/cp-140-aurora.html#details-panel-1470993891209-5']Issues/Risks[/URL] [/LIST] [HEADING=3]Project Updates[/HEADING] [B]December 3, 2021[/B] Proof of compliance phase 2 and operational test and evaluation phase 1 completed. [B]July 25, 2021[/B] Combined proof of compliance phase 2 (Mission Systems) and operational flight testing has started. [B]April 11, 2021[/B] First phase of proof of compliance flight testing (Flight Sciences) completed on CP140111. [B]March 30, 2021[/B] CP140118 (Production aircraft #1) delivered to 14 Wing Greenwood. [B]December, 2020[/B] CP140111 14 Wing Greenwood has started. [B]October 6, 2020[/B] Started modification of production to the third aircraft. [B]July 21, 2020[/B] The 2nd block IV prototype aircraft, CP140111, completed its first test flight from the IMP facility located at Halifax International Airport. [B]April 24, 2020[/B] CP140114, the fourteenth and last aircraft to receive the structural modifications under ASLEP was delivered. [B]February 21, 2020[/B] CP140108, completed its initial assessment flight, landing at 14 Wing Greenwood. [B]October 4, 2019[/B] Second incremental ground test readiness review is complete. [B]June 26, 2019[/B] Aircraft CP140110 was delivered. This is the 14th (and last) block III aircraft, of which 13 have been life-extended. [B]April 29, 2019[/B] The block IV prototype aircraft ground test readiness review was conducted. [B]October 16, 2015[/B] General Dynamics won a contract amendment to implement the block IV modifications to the data management system. [B]June 2015[/B] Block IV of the AIMP received project approval. [B]October 2014[/B] Two CP-140 Aurora were deployed on Operation IMPACT, the Canadian Armed Forces’ contribution to the fight against ISIL in the Middle East. [B]January 31, 2014[/B] Initial operational capability for block III was achieved. Block III involves the upgrade of the mission systems and sensors. [B]March 2012[/B] Block II of the AIMP was completed, involving replacement of outdated navigation and communication management systems, and associated radios. [B]March 2011[/B] Two CP-140 Aurora were deployed on Operation MOBILE, the Canadian Armed Forces’ participation in the international response to the popular uprising in Libya against the regime of Moammar Gadhafi. [B]February 2010[/B] One CP-140 Aurora supported the RCMP-led integrated security unit for the 2010 Vancouver Olympic Games under Operation PODIUM. [B]December 2005[/B] Block I of the AIMP was completed, involving replacement of the high frequency radio and several obsolete systems to provide a baseline for other major upgrades that will follow. [HEADING=2]Page details[/HEADING] Date modified: 2023-06-30 [URL unfurl="true"]https://www.canada.ca/en/department-national-defence/services/procurement/cp-140-aurora.html[/URL] Están extendidos y upradeados, SATCOM y hasta LINK 16. Saludos [/QUOTE]
Insertar citas…
Verificación
Libertador de Argentina
Responder
Inicio
Foros
Fuerzas Navales
Noticias y Actualidad de las Fuerzas Navales
Noticias de la Armada de Chile
Este sitio usa cookies. Para continuar usando este sitio, se debe aceptar nuestro uso de cookies.
Aceptar
Más información.…
Arriba