Denel AH-2 Rooivalk

S

SnAkE_OnE

Cuanto le sale cada Tiger o cada Apache a España y UK? una fortuna..creo que Westland es poco lo que ha ganado con esto, mismo el quilombo que se armo en Mitsu, no se olviden que eso tiene para rato!

España ya tenia mucho trabajo de por si con CASA, no nos olvidemos tambien la participacion en la produccion de componentes y estructuras para Mirage F-1.

El negocio lo da el numero de ejemplares por la economia de escala, lo que hacen las compensaciones es directamente "desparramar" la mayor parte posible de ese flujo de dinero localmente..sea en soporte, desarrollo o produccion. Son 2 casos aunque muy relacionados, directamente distintos.
 
Claro Snake, pero 24 no es un número despreciable, a eso voy. Estamos hablando de un negocio cercano a los U$S 1000M. Creo que por ese monto, cualquier empresa estaría interesada en negociar con nosotros.
 
El de fabricarlos aqui. Por la misma guita compras el doble de AH-1Z Viper Cobras.
Está bien, pero seguimos dependiendo de afuera. Encima de USA, que ya está visto, no quiere que seamos un país desarrollado.

Lo mismo pasó con los radares 3D de largo alcance, aunque tuvimos que esperar un poco más, hoy ya casi son una realidad y completamente Nacionales.
Hay que desarrollar la Industria Nacional. Ese es mi punto.
 
S

SnAkE_OnE

Claro Snake, pero 24 no es un número despreciable, a eso voy. Estamos hablando de un negocio cercano a los U$S 1000M. Creo que por ese monto, cualquier empresa estaría interesada en negociar con nosotros.

Es una fortuna para gastar solo en helicopteros de ataque cuando justamente prefiero uno mas polivalente, llegando hasta armar algo como el Arpia colombiano incluso.

Para todo vamos a seguir dependiendo de afuera...quien dice que el resto de los paises si quieran? todos quieren, hasta cierto punto donde interfiera con sus intereses.

Sobre el resto..siempre vas a tener necesidades compartidas y hasta a USA le pasa, sino ponete a armar todo si te da el cuero...y lo dudo muchisimo.
 
Está bien, nadie dijo independencia 100% cosa que es imposible, eso está claro y lo comparto.
El punto es que se debe tratar que en puntos sensibles se tenga la mayor independencia posible, para que no se dependa 100% de cosas (repuestos) que vengan del exterior y que comprometan la seguridad del país. Tenemos experiencia en ello.
A eso me refiero.

Respecto a tu propuesta de un helicóptero tipo Arpía, y sí, pienso igual, también es necesario algo así, podrías desarrollar algo basándote en el Super Cougar dejandolo similar al Puma Rumano si te parece.
Pero sería importante tener un helicoptero especializado también. Más si nuestros vecinos tienen tanques de 60tn.
 

Juanma

Colaborador
Colaborador
Juanma si 24 ejemplares es un número ínfimo para vos, haber, quisiera tener los 24 ínfimos ejemplares de Eurocopter Tigre HAD que tiene España entonces. Por si recordas, Eurocopter se instaló en España cuando ingreso este proyecto. Ahora trabajan en NH-90, también, entre otros ejemplares y/o partes para helicopteros de la firma. También fabrica partes para los ejemplares HAD de Francia (originalmente no previsto por Francia ya que pensaban en comprar 40 HAP y 40 HAC).
España originalmente no pertencía a este proyecto (Francia - Alemania).Otro dato más.
Luego de haber puesto los puntos sobre la "i" de las condiciones para su compra, en competencia nada más y nada menos que con el Apache.
España se hizo de una fábrica en su pais, dando trabajo local.

Entonces, no debemos descartar posibilidades por que si nomas, se deben hacer estudios de factibilidad económica - industrial para la fabricación o ensamblaje local. Solo esa etapa dirá que conviene.

Que SA haya comprado 12 ejemplares y aquí diga que necesitaríamos 24 (el EA dirá cuantos necesita) no tiene nada que ver, son necesidades de 2 Ejercitos diferentes.

El negocio no lo da el número de ejemplares, el negocio lo da, las compensaciones económicas recibidas, no si fabricamos 24-67 o 100.

Primero dicen lo del Apache britanico, los sacamos corriendo con eso.
Mencioné el temita turco y no lo tocaste.
Ahora salen con lo de los Tigres españoles.
Que comparaciones remotas hacen che....

Contame quienes son los comprometidos en adquirir Rooivalk con costos caros y que si o si vayan a comprar ese helo y no se van a ir por la competencia.
Dicho eso. Como comparas?

Y si le podemos seguir criticando cosas.
Estariamos metiendonos con un SdA que actualmente tiene 12 ejemplares y que no hay planes para mas....

Siguen sumando a la lista de motivos por los que no hay que hacerlo no?
 

Grulla

Colaborador
Colaborador
Juanma si 24 ejemplares es un número ínfimo para vos, haber, quisiera tener los 24 ínfimos ejemplares de Eurocopter Tigre HAD que tiene España entonces. Por si recordas, Eurocopter se instaló en España cuando ingreso este proyecto. Ahora trabajan en NH-90, también, entre otros ejemplares y/o partes para helicopteros de la firma. También fabrica partes para los ejemplares HAD de Francia (originalmente no previsto por Francia ya que pensaban en comprar 40 HAP y 40 HAC).
España originalmente no pertencía a este proyecto (Francia - Alemania).Otro dato más.
Luego de haber puesto los puntos sobre la "i" de las condiciones para su compra, en competencia nada más y nada menos que con el Apache.
España se hizo de una fábrica en su pais, dando trabajo local.

Primero, propones comprar 24 helicopteros de un modelo que ni siquiera en su pais quieren...para eso hubieras puestos AH-1Z, Mi-28, Ka-52...incluso podrias haber propuesto el WZ-10 Chino ahora que hay algunos acuerdos en marcha...segun parece.

Respecto a España, veamos CASA absorvida por EADS, Eurocopter es parte de EADS, el gobierno pone plata en CASA y por lo tanto en EADS, entonces que helicoptero elijo? El yankee o el europeo? Vos crees que somos España y los sudafricanos chochos nos van a dar el Rooivalk para fabricar acá??? Te andas juntando con Stuka? Falta que pongas que los podemos remotorizar con los Astazou
 

Buitreaux

Forista Sancionado o Expulsado
Matarte no, pero tu credibilidad (y grado de importancia que se le da atus aportes), quedan comatosos, en coma profundo podria decirse, despues de una sugerencia semejante.
 
Primero, propones comprar 24 helicopteros de un modelo que ni siquiera en su pais quieren...para eso hubieras puestos AH-1Z, Mi-28, Ka-52...incluso podrias haber propuesto el WZ-10 Chino ahora que hay algunos acuerdos en marcha...segun parece.

Respecto a España, veamos CASA absorvida por EADS, Eurocopter es parte de EADS, el gobierno pone plata en CASA y por lo tanto en EADS, entonces que helicoptero elijo? El yankee o el europeo? Vos crees que somos España y los sudafricanos chochos nos van a dar el Rooivalk para fabricar acá??? Te andas juntando con Stuka? Falta que pongas que los podemos remotorizar con los Astazou

Primero, hablo de fabricar o participar lo más posible en cualquier modelo a elegir. El Rooivalk me parece buena nave.
El mismo, si bien con problemas financieros (quien no los tuvo) durante su desarrollo y etapa de entrada en servicio, tiene el apoyo del Gobierno Sudafricano. Quisieron cancelar el proyecto, pero el gobierno actuó para apoyar el proyecto.

http://www.denelaviation.co.za/rooivalk.html

Tu deducción de que la adquisición del Tigre era una obviedad no es tan así. Recordá tambien el caso español donde se compró el Leopard IIE, pero su fábrica, la empresa nacional Santa Barbara Sistemas se vendió a General Dynamics Land System, fabricante del M1 Abrams. Todo es negocio. Complejos y no tan fáciles de interpretar a veces.
--- merged: Nov 1, 2011 4:10 AM ---
Matarte no, pero tu credibilidad (y grado de importancia que se le da atus aportes), quedan comatosos, en coma profundo podria decirse, despues de una sugerencia semejante.
Mi estimado Buitreaux, fué en tono de broma. Por eso el emoticón.
 

Juanma

Colaborador
Colaborador
Bajo ese concepto porque no adquirimos F-1 y los modernizamos con tecnología rusa?
Digo... a fin de cuentas sería mas o menos lo mismo que se plantea con el AH-2
 

BIGUA82

VETERANO DE GUERRA DE MALVINAS
Colaborador
Oversophisticated, overdelayed, overexpensive, outdated,

and lacking economies of scale

What went wrong with the Rooivalk,
South Africa's mighty tank killer?

By KEITH CAMPBELL & MARTIN ZHUWAKINYU |
8th June 2012 | Engeneering News
Eagle or turkey? Should it be saved or slaughtered? These are the questions exercising the minds of the South African government, parliamentarians, journalists, interested taxpayers (and they should all be interested, given the amount of money it has consumed), and, not least, the nation’s aerospace industry, concerning the Denel Rooivalk attack helicopter.

Reportedly, from the inception of the Rooivalk (Afrikaans for ‘Kestrel’) project in 1984 to the first flight of the first prototype in 1990, R1-billion was invested in the programme. From the start to the present, the programme is believed to have cost just over $1-billion (roughly R7-billion). For the sake of comparison, the cost of South Africa’s acquisition of 28 Gripen fighters and 24 Hawk fighter-trainers is $2,2-billion.

The Rooivalk was hailed in South Africa as a world-beater, the best such helicopter anywhere. Yet, 17 years after the Rooivalk first flew, not one export order has been won, and only 12 production standard aircraft have been manufactured, all for the South African Air Force (SAAF).

Even more incredibly, these production Rooivalks are still not fully operational and could not be deployed elsewhere in Africa if an emergency arose and United Nations (UN) forces needed their support. (The UN has employed Russian-built Mi-24 and Mi-35 attack helicopters on combat missions in the Democratic Republic of the Congo in recent years.)

No one could reasonably claim that this represents a success story. So what went wrong?


The idea of South Africa developing an attack helicopter was not, in and of itself, erroneous. The then South African Defence Force saw a real need for an attack helicopter, in order to escort and support heliborne raiding forces, destroy anti-aircraft positions, and meet the potential threat of growing tank forces in other African countries, particularly Angola. Equipped with anti-tank missiles, such a helicopter could neutralise numerically superior hostile tank forces.

But – and this is a very important point – South Africa could not design and build a complete helicopter from scratch. The design, development and manufacture of the necessary powerplant and dynamics system (rotor head, main and tail rotors, and main and tail gearboxes) were beyond this country’s capabilities. Acquiring such capabilities would have been extremely time consuming and incredibly expensive, rendering the project totally impractical. So the new machine had to be based on an existing design, as far as its power plants and dynamics were concerned.

At the time, the SAAF operated two main helicopter types – the Aerospatiale (formerly Sud Aviation, now Eurocopter) Alouette III and the Aerospatiale Puma. The Alouette III could not possibly form the basis of a credible attack helicopter – it was not just that it was small, but its powerplant and dynamics system were 1960s technology, clearly outdated, and lacking in power. (An Alouette III powerplant and dynamics system were used as the basis for an engineering and development capability demonstrator for Atlas – now Denel – as a precursor to the Rooivalk programme; designated the Alpha XH-1, it first flew in 1984 and is today preserved at the SAAF Museum at Air Force Base Swartkops, Pretoria.)

Athough the Puma was larger and more powerful than the Alouette III, it had already been displaced on the French production line by its bigger and more powerful offspring, the Super Puma, which first flew in late 1978. This led to South Africa’s developing and successfully executing a project to produce a new helicopter that was a hybrid of the Puma and the Super Puma – the Denel Oryx. The Oryx has a fuselage that is longer than that of the Puma but shorter than that of the Super Puma, and was fitted with the powerplants, dynamics systems, and tail boom of the Super Puma (later, military versions of the Super Puma were redesignated Cougar).

The result was and is a helicopter with a greater payload and range capability than the Puma and a greater power-to-weight ratio than the Super Puma/Cougar. In consequence, the Oryx (pictured below) is an ideal transport helicopter for the hot temperatures and high altitudes frequently found in Southern Africa.


The Oryx was developed in parallel with the Rooivalk prototypes. Being simpler and cheaper than the Rooivalk, the Oryx programme was completed much more rapidly, the helicopter being unveiled in 1991, and has been the SAAF’s transport helicopter ever since. Thus it was proposed that the Super Puma powerplants and dynamics systems, being made in South Africa for the Oryx programme, be used as the basis for the planned attack helicopter.

At least one engineer is known to have proposed that the attack helicopter be based on the engines and dynamics system of the Aerospatiale Dauphin, an intermediate- (light/medium) size helicopter with good manoeuvreability and power, which would have resulted in a smaller, more rapidly developed, and more economical (to develop, buy and operate) system. As the French were allowing South Africa to use the powerplants and dynamics of the Super Puma, they would surely have agreed to the South Africans using the same elements from the Dauphin. However, the SAAF felt that using the same engines and dynamics as the Oryx would simplify logistics and reduce maintenance costs, so the decision was made to use the Super Puma systems as the basis for the Rooivalk.

The consequence of this decision was that the attack helicopter would have to have a big airframe, which it needed in order to accommodate the fuel required for it to achieve the desired range. But it also meant that it would be able to carry many sensors, advanced avionics, and a heavy and diversified weapons load. In short, it would have the capacity to be outfitted as a top-of-the-line, world-beating attack helicopter. And this, possibly, plus the lavish defence budgets of the 1980s, seduced the SAAF and Armscor/Atlas/Denel into seeking to make the Rooivalk a world-beating system, forgetting the saying that “the best is the enemy of the good enough”.

This was the fundamental conceptual flaw in the programme – it was an oversophisticated project for a country like South Africa.

Trying to be the best drove up the costs, and extended the development timeframe, very significantly indeed. (The cost increase, relative to a simpler design, was not unforeseen, with the result that an appropriate budget was assigned and, contrary to some reports, the Rooivalk programme never exceeded its budget during the period 1984 to 1990.)

Whereas a simpler, cheaper, basic “good enough” Rooivalk system would almost certainly have completed its development in the late 1980s and entered production in parallel with the Oryx, the actual Rooivalk was far from finishing its development when the war in Angola ended in 1988 and the then South African government began to cut the defence budget. The first Rooivalk proto- type made its maiden flight only in 1990.

Budget cuts inflicted further delays on the programme, and the planned acquisition was cut from 36 to only 12. This deprived the programme of the benefits of economies of scale.

“Some key people in the SAAF felt that the Rooivalk was a threat to what was most important to them – their fighter programme – so they sought to kill it; for a period, the Rooivalk was kept going with army funding because the army felt that it was essential for them: without the Rooivalk, they would have needed a lot more armour,” reports defence analyst and Jane’s Information Group correspondent Helmoed Römer-Heitman. “But the money was always very tight.”

Make no mistake – the Rooivalk was a triumph for South African industry and technology. The programme created a significant and powerful pool of experience and expertise in the country, which played an essential role in the creation of highly successful South African private- sector aviation companies such as Advanced Technologies & Engineering (ATE) and Aerosud. But the delays that were caused by the budget cuts meant that what had been a cutting-edge aircraft in 1990 was an obsolete aircraft when it finally began to be delivered to the SAAF in 1998.

As a flying machine (as distinct from a fighting machine) the Rooivalk is first class, reportedly hailed by all who have flown it. It is also ideal for operations in Africa.

But its avionics system, a magnificent achievement for local industry when it was developed and integrated in the late 1980s, is today as obsolete as a dinosaur’s brain.

This is a key reason in Denel’s failure to export the aircraft. No one will buy a warplane whose avionics system is based on 20-year-old computers. Then there is the cost of the aircraft – the direct result of both attempting to make it a world beater and depriving it of eco-nomies of scale by cutting the order to only 12. “The unit cost of the Rooivalk is about $40- million,” says Heitman. This makes it as expensive as the Boeing Apache and the Eurocopter Tiger, the latest models of which have state-of-the-art avionics, and much more expensive than the smaller AgustaWestland Mangusta/Mongoose, and the Russian Mi-24/35 family.

Export possibilities have been further reduced by foreign worries about the long-term viability of Denel: will the company still be around in 20 years to continue to support the Rooivalk, if they should buy it? And then there is the fact that the Rooivalk is very heavily dependent on French technology, now the property of Eurocopter, yet Denel tried to export the Rooivalk not only without Eurocopter’s prior agreement and support, but actually in open competition (for example, in Australia) with Eurocopter’s own Tiger. Foreign diplomatic sources have indicated that the European company has warned countries interested in buying the Rooivalk that they could not be guaranteed the support they would need for the engines and dynamics. This effectively killed off any remaining interest in the Rooivalk.
The programme could simply be cancelled, the costs written off, the aircraft scrapped or sent to museums, like so many other South African aerospace projects launched in the 1980s. But the South African National Defence Force would still need an attack helicopter, to support UN missions elsewhere in Africa.

Attack helicopters do not need good-quality surfaces to operate from, nor large spaces, and they will also be able to operate from the flight decks of the Navy’s planned amphibious ships. Cancelling the Rooivalk will leave a gap which will, sooner or later, have to be filled by buying someone else’s attack helicopter.

Further, the Defence Force needs more than 12 of these machines – an absolute minimum deployment would need three attack helicopters, to ensure two were always available for operations; with just 12, the SAAF could not have more than just two such deployments at any time. But the Defence Force is already involved in three major missions – in Burundi, the Democratic Republic of the Congo, and Darfur, in Sudan. South Africa needed 24 attack helicopters, which would give 16 operational.

So, an alternative is to reinvest in the Rooivalk programme, order another 12, but to a new, more modern, yet simpler and cheaper, standard, and subsquently refurbish the existing aircraft to the same standard. This ‘Rooivalk Mk 2’ would also produce a much cheaper aircraft, with a unit cost of less than $20-million. That would be financially and technically much more appealing to many developing countries.

It would also cease to be a competitor to the Tiger, but become a complement to it.

This would open the door to cooperative marketing of the Rooivalk with Eurocopter, and, if this could be negotiated, the Eurocopter name and support would assure possible customers so that the new Rooivalk would indeed enjoy long-term through-life support.


Heitman thinks that developing the Rooivalk Lite, or Rooivalk Mk 2, will cost South Africa another R1,5-billion. “This is a lot less than the cost of scrapping it and bringing another type into service,” he argues.

Denel does not have that kind of money. Only the government does. The future of the Rooivalk thus lies in the hands of the Cabinet. They are the ones who are going to have to make the final decision. Ultimately, it is President Thabo Mbeki who will decide whether the aircraft will soar like an eagle or be slaughtered as a turkey.

This story was also based on interviews conducted, on the basis of anonymity, with an engineer and an SAAF officer, who were involved in different aspects of the Rooivalk project.





General characteristics
  • Crew: 2 (pilot & weapon systems officer)
  • Length: 18.73 m (61 ft 5 12 in)
  • Rotor diameter: 15.58 m (51 ft 1 12 in)
  • Height: 5.19 m (17 ft 0¼ in)
  • Disc area: 190.60 m2 (2,052.1 sq ft)
  • Empty weight: 5,730 kg (12,632 lb)
  • Loaded weight: 7,500 kg (16,535 lb)
  • Maximun takeoff weight: 8,750 kg (19,290 lb)
  • Powerplant: 2 x Turbomeca Makila 1K2 turboshafts, 1,420 kW (1,904 shp) each
  • Internal fuel capacity: 1,854 L (489.8 US gallons)
Performance
Armament


 

Duwa

Master of the Universe.
BIGUA, tenes que traducir tus posteos. Hay muchos foristas que no se defienden bien en ingles.
 
Arriba