De regreso al documento de EDA (Excess Defense Articles), también se podía ver el pedido de dos P&W F110-129 para la FACh.
http://www.dsca.mil/programs/excess-defense-articles-eda
Y en el FMS el 13 de este mes, en la parte de contratos de defensa apareció Chile mencionado en este contrato.
FA8121-10-D-0008: Core modules, fan drive turbines, inlet fans, and gearboxes for the F100 engine.
"United Technologies Corp. doing business as Pratt & Whitney, East Hartford, Connecticut, has been awarded an estimated $16,663,785 for the second option to previously awarded requirements for firm-fixed-price contract FA8121-10-D-0008. Contractor will provide remanufacture of FI00-PW-I 00/200/220/220E/229 engine modules. Work will be performed at Columbus, Georgia, and is expected to be complete by April 22, 2015. This contract is 100 percent foreign military sales for Chile, Egypt, Jordan, Thailand, Taiwan, Greece and Indonesia. This award is the result of a sole source acquisition and one offer was received. Air Force Space Command, Tinker Air Force Base, Oklahoma, is the contracting activity."
http://www.defense.gov/Contracts/Contract.aspx?ContractID=5479
En mi humilde opinión y solo sumando 1+1: Chile compro dos turbinas de segunda mano y mando a que le colocaran los módulos de modernización correspondientes.
Alguien con una opinión mas informada siéntase libre de descalificar mi opinión.
Se me chispoteo que el Block 50 tiene la turbina F110-GE-129 de General Electric y que los módulos son P&W (Pratt and Wittney), por lo cual tacho mi comentario anterior.
http://www.dsca.mil/programs/excess-defense-articles-eda
Y en el FMS el 13 de este mes, en la parte de contratos de defensa apareció Chile mencionado en este contrato.
FA8121-10-D-0008: Core modules, fan drive turbines, inlet fans, and gearboxes for the F100 engine.
"United Technologies Corp. doing business as Pratt & Whitney, East Hartford, Connecticut, has been awarded an estimated $16,663,785 for the second option to previously awarded requirements for firm-fixed-price contract FA8121-10-D-0008. Contractor will provide remanufacture of FI00-PW-I 00/200/220/220E/229 engine modules. Work will be performed at Columbus, Georgia, and is expected to be complete by April 22, 2015. This contract is 100 percent foreign military sales for Chile, Egypt, Jordan, Thailand, Taiwan, Greece and Indonesia. This award is the result of a sole source acquisition and one offer was received. Air Force Space Command, Tinker Air Force Base, Oklahoma, is the contracting activity."
http://www.defense.gov/Contracts/Contract.aspx?ContractID=5479
Alguien con una opinión mas informada siéntase libre de descalificar mi opinión.
Se me chispoteo que el Block 50 tiene la turbina F110-GE-129 de General Electric y que los módulos son P&W (Pratt and Wittney), por lo cual tacho mi comentario anterior.
Última edición: